0116153175CONTACT US
0item(s)

You have no items in your shopping cart.

Product was successfully added to your shopping cart.
Previous

Suntree DIY 2in-1out 1000V DC Solar PV Combiner Box Kit - Fuse Holder + SPD + 63A 4P Breaker + 12 Way DB

Previous

EARU 2P 63A AC Manual Change Over Switch for Eskom & Inverter Switch Over AC Protection Combiner Box

SINOTIMER Electricity Energy Meter Single Phase Rail Consumption Reset DDS6619-526L-2

Quick Overview

SINOTIMER Electricity Energy Meter Single Phase Rail Consumption Reset DDS6619-526L-2


- Model: SINOTIMER DDS6619-526L-2
- With backlight function, the value can be clearly seen in the dark environment
- Easy to install
- Large LCD screen
- Display: total power kwh, temporary power kwh, actual voltage, actual current, actual power, long press the button for 6s to reset
- Current: 5 -80A Max
- Voltage: 230V 50Hz
- Pulse: 1000imp/kwh
- Display mode: electronic digital display
- Size: 7.85 x 6.58 x 3.63 cm
- Installation: DIN Rail

R449.00

Availability: In stock

Details

SINOTIMER Electricity Energy Meter Single Phase Rail Consumption Reset DDS6619-526L-2


- Model: SINOTIMER DDS6619-526L-2
- With backlight function, the value can be clearly seen in the dark environment

- Easy to install
- Large LCD screen
- Display: total power kwh, temporary power kwh, actual voltage, actual current, actual power, long press the button for 6s to reset
- Current: 5 -80A Max
- Voltage: 230V 50Hz
- Pulse: 1000imp/kwh
- Display mode: electronic digital display
- Size: 7.85 x 6.58 x 3.63 cm
- Installation: DIN Rail


Installation Notes
1. The meter can be installed and used after being tested and sealed. Meters that are not sealed or stored for an extended period of time must be retested.

2. When taking out the meter from the original package, if the inner package or meter cover is found to be damaged, do not install the meter.
3. Only experienced electricians or professional technicians can install the meter, and make sure to read the user manual thoroughly.
4. The instrument must be installed in a ventilated and dry place, and the bottom plate of the instrument must be placed on a wall that is fire-resistant and not easy to shake.
5. The instrument must be installed in a protective box in a dusty place to avoid mechanical damage.
6. The wiring must conform to the wiring diagram of the watch case body or the wiring diagram of the instruction manual. It is recommended to use soft copper wire for input, so as not to burn the meter due to loose contact.
7. After the meter is correctly connected to the power grid, the power indicator of the meter should be on.
8. Take measures to avoid lightning damage in places with heavy thunderstorms.
9. The load capacity of the instrument is between 0.05Ib~Imax. If the capacity exceeds the above, the register is inaccurate or the current coil is heated and burned.
10. Data display: The meter has two rows of displays. The first row shows that the power can be reset to zero. Press the ''RESET'' button on the front panel for 3 to 5 seconds to reset to zero. The second row shows that the total power does not reset.
11. Pulse indication: When connecting the load of the meter with electric energy, the pulse indicator flashes (bright about 80ms).
12. Reverse indication: When the load connected to the meter uses energy in reverse, the reverse indicator light is on

Product Tags

Use spaces to separate tags. Use single quotes (') for phrases.